PNRR - National Recovery and Resilience Plan
Projects funded through Romania's National Recovery and Resilience Plan.
Construction of 0.4 MW Photovoltaic Plant
CompletedPNRR · Pilonul I · C6 Energie · I1 · PNRR2022/C6/M ENERGIE/I1
Development of new renewable energy production capacity through the construction of a 0.392 MW photovoltaic plant in Buzău Municipality. The project contributes to increasing green energy production for self-consumption (minimum 50%) and commercialization, as well as reducing CO₂ emissions by a minimum of 314.77992 tons/year.
Total Value
2.824.762,50 Lei (TVA inclus)
Non-refundable Funding
878.472,00 Lei (fără TVA)
Implementation Period
29.12.2023 – 30.09.2025
Implementation Location
Buzău Municipality, Plot 36, Parcel 675
Coordinating authority: Ministry of Investments and European Projects – NRRP
Download Press ReleaseDigitalization of VLADROM S.R.L.
In ProgressNRRP · C9 · Private Sector Support · SME Digitalization
Digitalization of VLADROM S.R.L. through the implementation of an integrated IT solutions package designed to optimize internal processes, improve information flow, and increase company competitiveness through the use of advanced digital technologies (ERP, IoT, AI, cloud computing, and social media).
Total Project Value
651.735,09 Lei
Non-refundable Funding (NRRP)
490.710,46 Lei
Implementation Period
11.04.2025 – 31.12.2025
Implementation Location
Unirii Blvd, No. 207, BCR Building, 2nd Floor, Buzău
Coordinating authority: Ministry of Investments and European Projects – NRRP
Download Press Release"The content of this material does not necessarily represent the official position of the European Union or the Government of Romania"
„PNRR. Funded by the European Union – NextGenerationEU"